Summary

To secure a responsible position as an Electrical Engineer where I can fully utilize my training and skills to contribute significantly to the success of the organization. I am committed to promoting safety awareness and high performance through:

1. Caring about People: Ensuring that the well-being of team members is prioritized.

2. Seeking High Performance: Striving for excellence in both my own work and that of my colleagues.

3. Innovation and Problem-Solving: Applying creative solutions to complex engineering challenges.

4. Integrity and Honesty: Upholding ethical standards in all professional dealings.

5. Teamwork: Collaborating effectively with others to achieve common goals.

Professional engineer with strong background in inspections, quality control, and compliance. Proven track record in ensuring safety, reliability, and efficiency in various projects. Strong focus on team collaboration and achieving results, adapting seamlessly to changing needs. Skilled in problem-solving, technical analysis, and project management. Dependable and proactive with keen eye for identifying and addressing potential issues.

Overview

5
5
years of professional experience
1
1
Certification

Work History

Construction Inspection Engineer

National Energy Authority (NEA PROJECT)
Port Moresby
04.2022 - Current
  • Led pre-feasibility studies, detailed design processes, and cost estimation for all project sites.
  • Executed thorough inspections of energy systems to uphold regulatory compliance.
  • Established inspection protocols to elevate safety standards and optimize operational efficiency.
  • Engaged with project teams to assess risks and implement effective corrective measures.
  • Conducted thorough analysis of inspection data to propose strategic improvements aimed at optimizing system performance and reliabili of 100 kW mini hydro system in Middle Ramu District. Supported project teams in executing tasks related to hydroelectric power generation.
  • Assisted in development of mini-hydro project in Morobe Province. Helped project teams reach hydroelectric energy objectives. Supported local community involvement for project success.
  • Oversaw deployment of 100 kW photovoltaic systems to enhance energy efficiency in Oro Province.
  • Oversaw deployment of 100 kW solar energy solution to enhance renewable energy access in Milne Bay Province.
  • Assisted in connecting PNG national electrification rollout plans with local stakeholders. Supported teams in implementing electrification strategies across various regions. Collaborated with cross-functional groups to facilitate national electrification initiatives.
  • Formulated detailed designs and construction drawings while preparing a bill of quantities to support project execution.
  • Assisted in developing transmission plans for Port Moresby to Kerema. Supported project teams in coordinating timelines and resources for effective implementation.
  • A. Port Moresby -Alotau Transmission Plans
  • B. Madang -Wewak Transmission Plans
  • C. Wewak -Vanimo Transmission Plans
  • D. Lae- Finschhafen Transmission Plans
  • KPI 3. Distribution Investments Plans
  • Developed detailed design, bill of quantities, budget, and scope of work for 13 transmission routes along Connect PNG corridor.
  • Rural Electrification Investment plans.
  • I. 13 Routs Extension for Distribution to Rural. This includes Detail design, BOQ, budgeting, and scoping.
  • KPI 4 PIP (Project Investment Program) submission to National Planning
  • I. Simbai Mini Hydro – secure K1 million from DNPM
  • Ii. Esa’ala PV Mini -Mini Grid Project.
  • Iii. Port Moresby – Kerema Transmission Plans PIP
  • Iv. Port Moresby -Alotau Transmission Plans PIP
  • V. Madang -Wewak Transmission Plans PIP
  • Vi. Wewak -Vanimo Transmission Plans PIP
  • Vii. Lae- Finschhafen Transmission Plans PIP
  • Assisted in developing rural electrification plans to enhance energy access. Supported project teams in implementing electrification initiatives in rural areas. Facilitated community engagement to identify electrification needs.
  • KPI 5. Logistics Coordinator -Planning all field trips for project officers to travel to the site to carry out the pre-feasibility study

Instrument Technician

Comlek Group
Oktedi
01.2025 - 03.2025
  • Calibrated and maintained instrumentation for optimal operational performance.
  • Diagnosed and resolved equipment malfunctions to minimize downtime.
  • Conducted routine inspections to ensure compliance with safety standards.
  • Collaborated with engineering teams to implement system upgrades and enhancements.

Graduate Development Program (Intern Electrical Engineer)

Lihir Gold Mining
07.2021 - 11.2021
  • SHUTDOWN LIHIR ELECTRICAL AND INSTRUMENTATION (E&I) INSTRUMENTATION
  • 1. SUBSTATION AIR CONDITION INSPECTION
  • Ensure all air conditions working and blowing cold air
  • Check condensate drains are unblocked
  • The Chack condenser fan is working
  • Chack wall mounting fixtures are secure
  • Check and clean the filter
  • Check if any unit has a form display
  • 2. 1326 CV2011 CONVEYOR, RECLAIM TRANSFER HGO2
  • Inspect to detect damaged or worn equipment and potential failures for maintenance attention.
  • Use the condition matrices to record
  • Complete the entire inspection list
  • Indicate any adjustment, in situ repairs, and component
  • Avoid an interruption of the inspection as this will result in a partial status report.
  • 3. PULL WIRE SWITCH CONNECTION
  • Inspect the pull wire and e-stop to confirm the hard wire stop circuit.
  • Inspect the lanyard(wire rope) for sign of wear, slack tension, or damage
  • Ensure pull wires are in good condition
  • 4. HGO 2 GRINDIAL ZONAL INSTRUMENT INSPECTION DIT6044
  • Inspect to detect damaged or worn equipment and potential failures for maintenance attention.
  • 5. D&R INSTRUMENTS INSPECTION FOR PUMB 2022 SUCTION VALVE CHANGE OUT.
  • Disconnect and reconnect the instrument for pu2022.
  • Secretion valve change out
  • Complete the entire inspection list
  • 6. INSTALLATION AND REPAIR PROXY SWITCH
  • Disconnect and reconnect proxy switches
  • ELECTRICAL TASK CARRIED OUT @Lihir Gold Mining
  • 1. 26 W REAGENT SS3777 MC3777 ELR TEST STAT
  • Check setting and test as per procedure
  • Repan document as required for improvement and accuracy
  • Include the tag number of equipment tested
  • Review the drawing required for the task
  • 2. INSPECT SWITCH ROOM
  • Inspect trip current, trip time
  • Trip the system and find out if all are working
  • 3. CV2005 CONV FEED ELECTRICAL INSPECTION TEST
  • Clean and check the enclosure. The hood cover, cable, and label are in good condition
  • Confirm stop batons are operated freely
  • Remove local Control System (LSC) cover
  • Assume all cables and terminals are LIVE unit certified DEAD by a qualified electrician.
  • Replace damaged components.
  • Inspect switches and terminals for loose worn connections and damage.
  • While open, activate the E-stop Batons to view the contacts operating.
  • Ensure enclosure/ cover is closed after inspections.
  • Ensure all screws are in place, gaskets are in place, in good condition.
  • 4. APRON FORWARD DRIVE MOTOR INSPECTION TEST SVCE
  • Assume that all cable and terminal are live until the correct isolations as be proven by testing of DEAD on all potential live components. Test all supply and control terminals.
  • Check the power system in the local control system for loose connections, heat, and damage
  • Replace hot junction and damage suspected component
  • Check for water in grease and dry if necessary
  • Check cable entries and ensure the glands are tight in it the gland plate and the glands are tied around the cable
  • Repair as necessary
  • Check the function of start and stop batons
  • Check the door lock and replace the damaged component

Education

Bachelor of Science - Electrical Engineering

Papua New Guinea University of Technology
Morobe (Lae)
04-2023

Skills

  • Proficient in Electrical Engineering principles and concepts
  • Proficient in MS Software such as MS Excel, MS Word, MS PowerPoint and MS Visio
  • Excellent communication and collaboration skills, with the ability to work effectively in a team
  • Skilled in Troubleshooting and diagnosing technical issues in a live broadcast environment
  • Strong Knowledge of Broadcast Transmission technologies, such as SDI, HDMI, IP, and Satellite
  • Proficient in Broadcast Engineering Principles, standards and practices
  • Experience with Circuit analysis, design, and simulation software tools (eg MATLAB, Simulink, PSpice)
  • Familiarity with Electrical Design Software Tools (eg AutoCAD Electrical, Livewire PRO)
  • Technical reporting
  • Inspection planning
  • Project management
  • Technical specification development
  • Technical report writing
  • Project coordination
  • Proficiency in CAD software
  • Load calculations
  • Project oversight
  • Technical consulting
  • Report generation
  • Proposal writing
  • Teamwork
  • Teamwork and collaboration
  • Problem-solving
  • Attention to detail
  • Time management
  • Problem-solving abilities
  • Multitasking Abilities
  • Reliability
  • Critical thinking
  • Team collaboration
  • Team leadership
  • Machine operation

Certification

2020

  • Electrical Engineering Degree 4 Years PNG Unitech

2023

  • Introduction to Social Accounting Matric (SAM)
  • Asian Development Bank (ADB) Manila

2024

  • Climate Finance Proposals GGGI
  • Dedication Mentor Program (GGGI)

2025

  • IEPNG Certified Professional Engineer

Timeline

Instrument Technician

Comlek Group
01.2025 - 03.2025

Construction Inspection Engineer

National Energy Authority (NEA PROJECT)
04.2022 - Current

Graduate Development Program (Intern Electrical Engineer)

Lihir Gold Mining
07.2021 - 11.2021

Bachelor of Science - Electrical Engineering

Papua New Guinea University of Technology

Attributes

I am hard working, reliable, and honest, have excellent communication and leadership skills, good listener, and am able to complete given tasks in the required time

Leadership Roles

  • 2020 Chairman of Morobe student and staff association Unitech.
  • 2019 President of Unitech Nazarene Student Fellowship Unitech.
  • 2018 Vice President of Nazarene Student Fellowship Unitech.
  • 2017 Secretary of Electrical Engineering Student Association Unitech.
  • 2016 Chairman of Unitech Jiwaka Student And Staff Association.

Disclaimer

I’m Mr. SEMSEN PAUL ATA, do solemnly and sincerely declare to you that every piece of information given herein is very true and genuine in every, and I Oath to perform any assigned duties to me to the very best of my ability and knowledge attained so far. I, therefore, signed below as proof of my Oath to you.