Summary
Overview
Work History
Education
Skills
Websites
Career Statement
References Available
Software
Timeline
Hi, I’m

Naison Stanley

Civil Engineer
Goroka,Eastern Highlands
Naison Stanley

Summary

Result-oriented Civil Engineer with success in creating designs and engineering plans to establish project specifications. Detail-oriented in assessing project objectives to determine the correct direction for project planning and technical drawings. Meticulous in remaining involved throughout the life of the project by analyzing project data and reporting in accordance with regulations.

Overview

4
years of professional experience
4
years of post-secondary education

Work History

K92 Mining Ltd

Senior Project Engineer
8 2023 - Current

Job overview

  • Responsible for leading in project planning, investigation, design, and producing work packages
  • Produced technical drawings, and general arrangements, and led daily production meetings
  • Experience in power station foundation works from set-out, excavation, and earthing to slab foundation
  • Assisted in monitoring contractors' compliance and performance, and in recruitment and procurement processes
  • Assisted the project manager with tasks related to project success, assumed HoD duties, and attended HoD meetings when necessary
  • Identified potential risks early in the process, allowing proactive mitigation measures to prevent delays or setbacks.
  • Mentored junior engineers to develop their skills, resulting in a more knowledgeable and versatile workforce.
  • Enhanced team productivity with regular progress meetings, thorough task allocation, and prioritization of tasks based on urgency and importance.
  • Calculated risks during project development and managed risks throughout projects.
  • Developed accurate technical drawings to direct successful engineering projects.
  • Determined and scheduled priorities as required to progress engineering work.

K92 Mining Ltd

Project Engineer
05.2022 - 07.2023

Job overview

  • Responsible for ensuring TSF embankment Stage 1A/1B is built per the designer's requirements, conducting as-built engineering and survey inspections, and working with the geotechnical team and the designer's representatives to avoid the exposure of the current TSF
  • Established QA-QC documents based on the Designer's specifications and established a QA-QC Document Tracker using MS Excel
  • Prepared daily work plans and assistance to Foreman and Site Engineers
  • Performed Engineering Survey Design checks using Deswik CAD, Structural and Hydrological Design of Culverts
  • Preserved professional communication between the Principal Team lead, the Designer, and the Construction crew
  • Produced, implemented & reviewed Construction Methodology, TMPs, QA-QC sequence, and overall workflow
  • Formulated Daily and Weekly physical progressive reports to the Superintendent and Project Director
  • Appraised JSA's, SOPs, and other safety-related documents
  • Presided over daily production meetings with field crew, coworkers, and line managers
  • Successfully completed the project below budget, 2 weeks ahead of schedule, and in compliance with ATCW standards.
  • Negotiated contracts with suppliers to secure favorable terms, resulting in cost savings for the company.
  • Developed detailed project plans to ensure timely completion and deliverables were met.
  • Improved communication among stakeholders through regular updates and meetings.

Hides Gas Development Company (HGDC)

Cost Control/Planning Engineer
01.2021 - 04.2022

Job overview

  • Responsible for overseeing and monitoring overall project expenses, including validating invoices and claims from suppliers, vendors, and subcontractors to ensure accurate and comprehensive project expenditure records
  • Provided planning and cost-controlling support for all projects, including variation reporting and milestone progress monitoring
  • Managed project activity scheduling and coordination to resolve issues for timely project completion
  • Reported project costing to the team and management monthly to ensure expenditure within the project budget
  • Reduced project costs by 8% through efficient management
  • Successfully completed the project below budget and in accordance with Department of Works (DoW) standards.
  • Developed customized reports for stakeholders, presenting key performance indicators that informed decisionmaking.
  • Monitored project progress, identifying potential risks and implementing corrective actions to mitigate their impact.
  • Provided technical support to project team members, ensuring adherence to quality standards and best practices.

Metallurgical Corporation of China (MCC)

Graduate Project Engineer
02.2020 - 12.2020

Job overview

  • Responsible for assisting in project planning, design, and documentation
  • Scrutinized and forecasted project KPI's using Microsoft Excel
  • Delivered technical reports, drawings, and QA-QC checklists for various project aspects
  • Monitored subcontractor compliance and performance
  • Supported the Construction Manager with project-related tasks.

GLC Enterprise Co. Ltd

Site Engineer
12.2019 - 01.2020

Job overview

  • Responsible for the planning and execution of Culvert Edge Treatment Works
  • Led on-site construction teams for culvert end treatment reconstruction
  • Documented daily reports and timesheets for construction workers
  • Offered daily supervision of concrete and masonry work.

Education

PAPUA NEW GUINEA UNIVERSITY OF TECHNOLOGY

Bachelor's Degree of Engineering in Civil Engineering
01.2016 - 05.2019

Skills

Team Leadership & Coordination

Career Statement

Apart from contributing to the processes and strategies that enhance any projects Naison Stanley is involved in, his greatest strengths lie in his versatile skills in computer software programs. Secondly, he excels in clearly understanding the project scope and the client's requirements. Finally, Naison is adept at coordinating and communicating effectively with the team, with a key focus on building strong working relationships to foster a cohesive team and achieve the project objectives.

References Available

True

Software

Microsoft Excel

AutoCAD

DeswikCAD

Microsoft Software Packages

Tekla Structures

Rocscience Software Suite

Timeline

Project Engineer

K92 Mining Ltd
05.2022 - 07.2023

Cost Control/Planning Engineer

Hides Gas Development Company (HGDC)
01.2021 - 04.2022

Graduate Project Engineer

Metallurgical Corporation of China (MCC)
02.2020 - 12.2020

Site Engineer

GLC Enterprise Co. Ltd
12.2019 - 01.2020

PAPUA NEW GUINEA UNIVERSITY OF TECHNOLOGY

Bachelor's Degree of Engineering in Civil Engineering
01.2016 - 05.2019

Senior Project Engineer

K92 Mining Ltd
8 2023 - Current
Naison StanleyCivil Engineer