Summary
Overview
Work History
Education
Skills
Additional Information
Timeline
Generic

Capital District

Mechanical Technician/Fitter
PORT MORESBY ,Port Moresby

Summary

I have achieved Certificate 2 and Certificate 3 in Engineering in Mechanical (TAFE Queensland) along with Electronics Communications/ Digital Networks (City & Guilds) and have worked in Both Oil & Gas and the Mining Industries. So far I have earned me more than 5 years work experience. With these in possession I am willing to expand my knowledge with the best should I be given the opportunity with your company. Focused Mechanical Technician with 6 years of experience in Mechanical Trades. Adept at working in demanding situations and with heavy machinery and equipment. Dedicated to increasing effectiveness by streamlining workflows and maintenance procedures with knowledge of developing and enhancing best practices.

Overview

8
8
years of professional experience
5
5
years of post-secondary education

Work History

Mechanical Technician

Rebuild Shop PM10
09.2022 - Current
  • Fixed Plant Maintenance Newcrest Lihir
  • Rebuilt Clarkson Valves and Actuator
  • Carried out fault find
  • Disassemble/ Assemble Pulveriser
  • Rebuilt NC Screen for the Tanks and Tails
  • Refurbished Sag Mill Trolley
  • Perform maintenance on Hydraulic and Pneumatic systems
  • Ensuring Quality Control/ Assurance
  • Training and mentoring as required
  • Disassemble Gear Box and Assemble
  • Rebuilt Tail Pulley Bearing according to Specs
  • Disassemble Pump Barrels
  • Perform Oxy Cutting
  • Perform Dogging Calculations/ High Risk and Used Hydraulic nut on SKF Bearing

Cementing Assistant

Halliburton Overseas Ltd
11.2021 - 06.2022
  • Rig up Cement Unit, Uni Pro, hardliners,
  • Precheck HT400 pumps, Air compressor, Batch Mixer
  • Identify bulk equipment
  • Perform hydro test on batch mixer8
  • Perform maintenance work on Batch Mixer, HT 400 pump
  • Operate Batch Mixer
  • Operate HT 400 pumps remotely
  • Identify airlines, hydraulic lines, Cementing lines, water lines
  • Reading from charts, unipro
  • Rig up Unipro by wiring Unipro to HT400 pumps, Batch Mixer Motion Sensors and RCM units.

Drill Assistant/Offsider

Newcrest Mining Lihir PNG
12.2020 - 01.2021
  • Mechanical inspections
  • Replaced gate valves
  • Training and mentoring as required
  • Blades on Agitator mixer tank
  • Installed brand-new Gear Box on Agitator mixer tank
  • Perform maintenance on Hydraulic and Pneumatic systems
  • Installed brand-new motor onto Agitator Gear Box
  • Replaced Weir compartment inside Autoclave with the use of hand grinder, rattle gun and jack hammer
  • Rebuild Gate Valve, inspect shaft keys and key ways
  • Torque up bolts and nuts with the use of Torque Rench and J-Gun
  • Shape up hydraulic pipes using bench pipe bender
  • Install hydraulic pipes onto Xmas tree actuator valve hydraulic system
  • Performed High/ Hot Torque using Hydro-Torque or Hydro-Nut equipment
  • Wagstaff Piling, Seepage Barrier Trial Project, Newcrest Mining, Lihir Island
  • Taking Bentonite Slurry Density
  • Taking Bentonite Hydration Time (Marsh Cone Viscosity Test
  • Sodium Silicate + Water Density
  • Cement + Water Density
  • Cement + Bentonite Slurry Density
  • Operate SGM Cement Batch Plant
  • Pre-Start SGM Cement Batch Plant

Mechanical Fitter

Autoclave Shutdown
02.2020 - 01.2021

Mechanical Fitter

Lihir Business Services, Newcrest Mining Operations
10.2019 - 04.2020
  • SHUTDOWN (FGO, HGO1, HGO2 Mills, Jaw Crusher and Primary Crusher Stacker
  • Used laser alignment tool to align shafts and belt drives
  • Trash Screen Roller change out
  • Roller bearing Mechanical Inspection
  • Trash Screen Panel change out
  • Valve, Suction HGO2 sump inspection and change out
  • HGO2 Liner Sampler Zonal Mechanical Inspection
  • FG12001 Sump and Cyclone feed FGO SU1001
  • Replaced water additional spools- FGO
  • Cyclone Feed FGO, replaced pipes PU1012 to Y piece
  • Primary Stacker- replaced drive pulley and tail pulley
  • Primary Stacker-replaced counter weight cable
  • Jaw crusher- replaced swing jaw and fixed jaw
  • Stock file feeder mechanical inspections
  • Feeder Dribble mechanical inspections

Mechanical Fitter

Total
01.2018 - 01.2019
  • Waste Management
  • Filled out Daily Job Card
  • Did Prestart on HPW
  • Performed the Duties of a Project Supervisor on Various Projects
  • Worked with High Pressure Water (HPW)
  • Have Access to Caltex Refinery Brisbane
  • Filled out information on Spread Sheet Excel
  • Prepared Crew for ExxonMobil Shutdown Work
  • Filling out I.R Form for Purchase Order
  • Did Chemical Fixation and Incineration
  • Participated in Toolbox Meeting and Supervisor’s Meeting

Driller Assistant

swift PNG, Mining Limited
12.2016 - 07.2017
  • Groundwaves Drilling Services, Newcrest Mining Operations, Lihir Island
  • Carried out Vibrating Water Processor
  • Performed cementing Job according to Haul Plan
  • Carried out work according to Haul Plan
  • Worked as, Carried out Standard Pressure Test
  • Set up Pressure Test Equipment
  • Carried out Standard Operating Procedure for Newcrest

Field Service Technician

Airswift PNG
01.2014 - 05.2016
  • Weatherford Asia Pacific, LNG Projects PNG Operations
  • Graph Interpretation from Jam Computer during Operation
  • Pre-Job Function Checks on Safety Clamps, Rig-Up, Rig down, Post Job Maintenance
  • Power Tong Operator using hydraulic system under managed controls
  • Jam Pro Computer Program, rigging up and rigging down power and its air supply
  • Pre check, test and troubleshoot power, hydraulics and air pressure supply (300psi)
  • Monitoring operation of power tong on rig floor using the Jam Pro Computer
  • Identify electrical cords according to the size of casing or tubing pipe
  • Operated hydrogen sulphide lifesaving apparatus
  • Worked on 12 hours shift operation and on a fly in fly out basis

Mechanical Engineering Trainee

Rabtrans Ltd
01.2014 - 03.2014
  • Relaying of information to supervisor
  • Performed light service on light vehicle
  • Listing worn out/ damaged vehicle parts
  • Replace oil filter, fuel filter, air cleaner, brake shoes, brake pads,
  • Drain out of engine, difference and transmission oil
  • Refilling of engine, difference and transmission oil
  • Bleeding brakes and fuel system
  • Remove and replace of shaft (four wheel and two wheel), axle and wheel bearing (front and rear)

Drill & Blast Operator

New Guinea Gold
09.2011 - 01.2013
  • New Britain
  • Pre-check drill Machine
  • Service and repair rigs (ECM- 360 Ingersoll Rand and Atlas Copco)
  • Operated blast hole drill rigs (ECM- 360 Ingersoll Rand and Atlas Copco)
  • Developed competency in blasting operation including AN mixing,
  • Drill hole logging, blast hole loading and tie ups
  • Qualified in general blasting and drilling operation
  • Worked overtime with minimum supervision.

Education

Certificate III MEM30205 (Australian MEM - undefined

Australia Pacific Technical College (TAFE
06.2017 - 12.2017

Certificate II (MEM 20105) Mechanical Engineering - undefined

Barrier Reef Trade Training Centre, Institute of TAFE
06.2013 - 12.2013

undefined

Kokopo Open Campus
06.2010 - 12.2010

Communication Systems and Digital Networks 1 (MC) City & Guilds Program - undefined

Telikom Training College
01.2008 - 12.2008

High Pressure Water Certificate (SAFETY CORP) - undefined

Operate Breathing Apparatus- MSMWHS216 - undefined

Gas Test Atmospheres MSMWHS217 - undefined

Enter and Work in Confined Spaces- RIIWHS202D - undefined

Certificate III MEM30205 (Australian MEM - undefined

Certificate II (MEM 20105) Mechanical Engineering - undefined

Barrier Reef Institute of TAFE

Mechanical Engineering Certificate 2 - undefined

Students’ Academic - physics

Electronics Communication 1 (MC - undefined

Communication Systems and Digital Networks 1 (MC) – Credit Class 3 PNG Driver’s License G1 (driving permit) Site Permit Newcrest Mining Limited - undefined

undefined

01.2017 - 01.2020

Skills

Decision making, Job Planningundefined

Additional Information

  • Gender:, Male D.O.B:, Marital status, Nationality:, Province: East New Britain Province Driver’s License:Class 3 PNG Driver’s License

Timeline

Mechanical Technician

Rebuild Shop PM10
09.2022 - Current

Cementing Assistant

Halliburton Overseas Ltd
11.2021 - 06.2022

Drill Assistant/Offsider

Newcrest Mining Lihir PNG
12.2020 - 01.2021

Mechanical Fitter

Autoclave Shutdown
02.2020 - 01.2021

Mechanical Fitter

Lihir Business Services, Newcrest Mining Operations
10.2019 - 04.2020

Mechanical Fitter

Total
01.2018 - 01.2019

Certificate III MEM30205 (Australian MEM - undefined

Australia Pacific Technical College (TAFE
06.2017 - 12.2017

undefined

01.2017 - 01.2020

Driller Assistant

swift PNG, Mining Limited
12.2016 - 07.2017

Field Service Technician

Airswift PNG
01.2014 - 05.2016

Mechanical Engineering Trainee

Rabtrans Ltd
01.2014 - 03.2014

Certificate II (MEM 20105) Mechanical Engineering - undefined

Barrier Reef Trade Training Centre, Institute of TAFE
06.2013 - 12.2013

Drill & Blast Operator

New Guinea Gold
09.2011 - 01.2013

undefined

Kokopo Open Campus
06.2010 - 12.2010

Communication Systems and Digital Networks 1 (MC) City & Guilds Program - undefined

Telikom Training College
01.2008 - 12.2008

High Pressure Water Certificate (SAFETY CORP) - undefined

Operate Breathing Apparatus- MSMWHS216 - undefined

Gas Test Atmospheres MSMWHS217 - undefined

Enter and Work in Confined Spaces- RIIWHS202D - undefined

Certificate III MEM30205 (Australian MEM - undefined

Certificate II (MEM 20105) Mechanical Engineering - undefined

Barrier Reef Institute of TAFE

Mechanical Engineering Certificate 2 - undefined

Students’ Academic - physics

Electronics Communication 1 (MC - undefined

Communication Systems and Digital Networks 1 (MC) – Credit Class 3 PNG Driver’s License G1 (driving permit) Site Permit Newcrest Mining Limited - undefined

Capital DistrictMechanical Technician/Fitter